Toyota Land Cruiser 100/Amazon, Lexus LX 470

since 1997 of release

Repair and car operation



Toyota Land Cruiser, Amazon, LX470 Lexus
+ Identification numbers of the car
+ Governing bodies and receptions of safe operation of the car
+ Settings and routine maintenance of the car
- Engine
   + Typical procedures of service of engines
   + Procedures of service of the petrol engine
   - Procedures of service of the diesel engine
      Removal, installation, dismantling and assembly of a head of cylinders
      Removal and installation of the inlet pipeline and final collector
      Removal, check of a condition and installation of a belt of a drive of GRM
      Removal and installation of cogwheels of a drive of GRM
      Replacement of a forward epiploon of a cranked shaft and camshaft and TNVD epiploons
      Replacement of a back epiploon of a cranked shaft
      Removal and installation of camshafts and pushers of valves
      Removal and installation of the pallet of a case of the engine
      Removal, check of a condition and installation of the oil pump
      Removal and installation of a maslookhladitel
      Removal and installation of a driving disk
+ Systems of cooling of the engine, salon and air conditioning heating
+ the Power supply system and production of the fulfilled gases
+ engine Electric equipment
+ Control systems of the engine and decrease in toxicity of the fulfilled gases
+ gear shifting Box
+ Transmission line
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment




Removal and installation of the pallet of a case of the engine

Details of installation of the pallet of a case and oil pump

1, 13 — the case Pallet
2, 5, 11 — Laying
3, 12 — Maslozabornik
4 — the Case of the oil pump
6 — the Conducted gear wheel

7 — the Spring
8 — Reduktsionny the valve
9 — the Washer
10 — the Back cover of a belt of a drive of GRM
14 — the Washer

Removal

 PERFORMANCE ORDER

1. Elements of installation of the pallet of a case of the engine and the oil pump are shown on an illustration above.
2. Remove details of a drive of GRM (see. Section Removal and installation of cogwheels of a drive of GRM).
3. Merge cooling liquid.
4. Merge impellent oil and remove the oil filter.
5. Give fixture of the pallet of a case then separate it from the engine block, in case of need having accurately hooked it a small screw-driver or a shpatel, try not to damage interfaced surfaces.
6. If necessary remove a maslozabornik with laying.

Installation

 PERFORMANCE ORDER

1. Accurately scratch out from interfaced surfaces of the pallet and the block all traces of hermetic and a material of old laying. Carefully wipe interfaced surfaces the rags moistened in acetone. Clean a carving of deaf boltovy openings in aluminum molding of the block.
2. Check a condition of the mesh filter of a maslozabornik, wash out solvent a maslozaborny tube, replace sealing laying, establish assembly of a maslozabornik on the engine and with demanded effort tighten fixing bolts.
3. If removed, establish into place a maslozabornik with new laying, tightening bolts of his fastening with demanded effort.
4. Impose on the specified surfaces the hermetic roller in thickness of 2-3 mm (address to an accompanying illustration).
5. Accurately press the pallet to the block of the engine and screw fixing bolts. Moving from the center outside, in three-four receptions tighten fixture with demanded efforts.
6. Further installation is made as it should be, the return to an order of dismantle of components. Tighten fixture with demanded effort. Do not forget to replace the filter and to add oil.
7. Start the engine and check the pallet on existence of signs of development of leaks. Check also pressure of oil.