Toyota Land Cruiser 100/Amazon, Lexus LX 470

since 1997 of release

Repair and car operation



Toyota Land Cruiser, Amazon, LX470 Lexus
+ Identification numbers of the car
+ Governing bodies and receptions of safe operation of the car
+ Settings and routine maintenance of the car
- Engine
   + Typical procedures of service of engines
   + Procedures of service of the petrol engine
   - Procedures of service of the diesel engine
      Removal, installation, dismantling and assembly of a head of cylinders
      Removal and installation of the inlet pipeline and final collector
      Removal, check of a condition and installation of a belt of a drive of GRM
      Removal and installation of cogwheels of a drive of GRM
      Replacement of a forward epiploon of a cranked shaft and camshaft and TNVD epiploons
      Replacement of a back epiploon of a cranked shaft
      Removal and installation of camshafts and pushers of valves
      Removal and installation of the pallet of a case of the engine
      Removal, check of a condition and installation of the oil pump
      Removal and installation of a maslookhladitel
      Removal and installation of a driving disk
+ Systems of cooling of the engine, salon and air conditioning heating
+ the Power supply system and production of the fulfilled gases
+ engine Electric equipment
+ Control systems of the engine and decrease in toxicity of the fulfilled gases
+ gear shifting Box
+ Transmission line
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment




Replacement of a back epiploon of a cranked shaft

 PERFORMANCE ORDER

1. Remove AT or a coupling basket (see. Head gear shifting Box).
2. Remove a driving disk or a flywheel.
3. Remove a back plate of the engine (address to an accompanying illustration).
4. Removal of an old epiploon can be made without preliminary dismantle of its case by a poddevaniye way by its screw-driver, however, in order to avoid risk of damage of a pin of a cranked shaft, originators of the real Management recommend to operate according to the instructions stated below.
5. Turn out bolts of fastening of the case of an epiploon to the block and remove assembly, smooth out interfaced surfaces from fragments of a material of laying and old hermetic (address to an accompanying illustration).
6. Having laid the removed holder on a workbench on two wooden blocks, beat out an old epiploon a drift from the back party of a plate (address to an illustration).
7. Wipe a nest under epiploon landing by acetone. Lay the holder on a flat firm surface and begin to knock in a nest a new epiploon, as an opravka having used wooden whetstone or a piece of a pipe of suitable diameter.
8. Grease epiploon sponges with pure impellent oil.
9. Having accurately pressed the holder, plant it on the regular place. Act without hurrying up, watching that there was no wraparound of sponges of an epiploon at its putting on on a shaft pin (address to an illustration). Screw fixing bolts and evenly tighten them with demanded effort.

10. Further installation is made as it should be, the return to an order of dismantle of components.