Toyota Land Cruiser 100/Amazon, Lexus LX 470

since 1997 of release

Repair and car operation



Toyota Land Cruiser, Amazon, LX470 Lexus
+ Identification numbers of the car
+ Governing bodies and receptions of safe operation of the car
+ Settings and routine maintenance of the car
+ Engine
+ Systems of cooling of the engine, salon and air conditioning heating
+ the Power supply system and production of the fulfilled gases
+ engine Electric equipment
+ Control systems of the engine and decrease in toxicity of the fulfilled gases
+ gear shifting Box
- Transmission line
   Specifications
   Driveshafts and hinges - the general information
   Check of a condition of the transmission line
   Removal and driveshaft installation
   Replacement of kardanny hinges
   Driving shaft/semi-axes, - the general information and condition check
   Removal and installation of semi-axes, bearings and epiploons of the back bridge
   Replacement of an epiploon of a leading gear wheel of differential
   Removal and installation of assembly of the back bridge
   Removal and installation of power shafts
   Replacement of protective covers and service of CV JOINTS
   Removal and installation of assembly of forward differential
   Removal and installation of naves with a disconnected drive
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment




Removal and installation of naves with a disconnected drive

Details of installation of a nave with manual shutdown of a drive of forward wheels

1 — the Conic washer
2 — the Nut
3 — Sealing laying
4 — the nave Case

5 — the Bolt
6 — Sealing laying
7 — a nave Cover

Components of the lock of a nave with manual shutdown of a drive

1 — the Lock ring
2 — the Remote ring
3 — the nave Case
4 — the Lock ring
5 — the Gear ring of a nave
6 — the Internal nave
7 — the Coupling of coupling of the lock of a nave

8 — Drove
9 — the Lock ring
10 — the Steel ball with a spring
11 — a nave Cover
12 — the Spring
13 — the Spring
14 — the management Handle with an epiploon


 PERFORMANCE ORDER

1. Transfer a nave cover to the situation Free (Freely).
2. Turn out fixing bolts, then uncover also internal components of a nave (address to an illustration of the Detail of installation of a nave with manual shutdown of a drive of forward wheels).
3. At the corresponding complete set turn out a bolt from an end face of a power shaft.
4. Give nuts of fastening of the case of a nave.
5. By means of a brass drift bring down from assembly konusny washers.
6. Remove the nave case from the pin of a power shaft equipped with shlitsa.
7. Failure of locks of inclusion of a drive of naves occurs owing to hit in them of dirt and moisture more often. If there is a need for further dismantling of a nave, try to pay the closest attention to an order and a way of installation of each of components. Put components on a workbench as their dismantle. Serially wipe each of details, grease components with universal greasing, then establish them on the regular places (address to an illustration Components of the lock of a nave with manual shutdown of a drive).
8. Installation of components of a nave is made as it should be the return to an order of their dismantle. Do not forget to replace sealing laying and to grease shlitsa of the internal loose leaf with universal greasing. Before installation the management handle on a cover of a nave should be turned in the situation Free, track correctness of input in gearing of uvulas drove with the sites of the case of assembly deprived of teeths.